Hi All,
As per control parameter settings we have max. no processes as 6 and 10 data packages for one Info doc and its the same for that particular infosource settings.
but when we schedule the delta info package( R/3 - BW ODS) it is using only one process and one (data package per Idoc.
But when the data is being updated from ODS to cube its using 6 processes ( in SM66) and almost 6-10 data packages( details tab in scheduler page).
How can we speed up the delta load from R/3 to ODS, and make it use upto 6 processes.
Where can I check these settings?
Thanks in advance.
Robyn.