We are using GRC 10.1. At risk manager stage, currently our default valid to date for assignment of mitigation controls is set at one year from the valid to date. We would like to change that default period. I looked in SPRO to find how to change but cant seem to find it. I know in 5.3 version you could change the default duration of mit control in days but can not seem to find the setting in 10.1. Any ideas?
Hi Pooja,
Please check for parameter 1011 to make changes to default expiration time for mitigation control assignments.
SPRO --> GRC --> AC --> Maintain Configuration Settings.
Regards,
Surya