on 04-10-2017 8:21 AM
Hi,
When i do COPA assessments i do not want to use a single assessment cost element as the receiver. Instead of that i want to retain the original cost element as it is in the receiver COPA PSG. Therefore i tried to use an allocation structure where i set settlement cost element "By cost element" and the receiver object as PSG. I did not set anything for the assessment cost element.
However, when i run the COPA assessment, the system throws this message
"No assignment of an assessment cost element to cost element Message no. GA834"
Does this mean that i still have to use an assessment cost element? In that case how can we ensure the original cost element is retained in the receiver object?