I have the following requirement

MATMAS idoc is created in MDM and sent to ECC and then the IDOC has to be sent to PI

But the IDOC which is sent from MDM contains many fields and all the fields are not required in ECC side

can we push the same idoc by removing some fields which has come from MDM

or is there any other method by which we can remove some fields and push the idoc from ECC to PI

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Apr 06, 2017 at 02:19 PM
    Add comment
    10|10000 characters needed characters exceeded

    • Hi Evgeniy,

      The idoc has successfully reached the ECC

      and Next part-when sending from ECC->PI some fields have to be removed from the original idoc (from MDM) and then the idoc has to be sent to PI

      Can this be achieved through messaging mapping

      OR

      we write some code in ECC modify/Create New idoc and then send that idoc to PI

      which is the right approach in the above

      Requirement 2)The functional consultant wants to know when the idoc has reached the ECC and based on some criteria then trigger the idoc from ECC to PI

      How can we achieve the above

  • Apr 06, 2017 at 02:24 PM

    Hi,

    In the Message Mapping you can mapping only relevant MATMAS IDoc fields from MDM to ECC.

    Regards!

    Add comment
    10|10000 characters needed characters exceeded

    • Hi Alejandro

      The idoc has successfully reached the ECC

      and Next part-when sending from ECC->PI some fields have to be removed from the original idoc (from MDM) and then the idoc has to be sent to PI

      Can this be achieved through messaging mapping

      OR

      we write some code in ECC modify/Create New idoc and then send that idoc to PI

      which is the right approach in the above

      Requirement 2)The functional consultant wants to know when the idoc has reached the ECC and based on some criteria then trigger the idoc from ECC to PI