Rakesh,
Take a look at this Documents for all the info and steps,
Summarizing~~
<u><b>XI SLD</b></u>
1. Create Technical System for R3
2. Create Business System for the Logical Client of the R3.
<u><b>XI</b></u>
1. SM59 --> Create RFC destination for the R3 system
2. IDX1 --> Create Port for the R3 system .
To increase performance, <b>use of Proxies is recommended</b> and the best way to integrate with SAP systems. But, <b>proxies can be used only with SAP system on WAS >= 6.20</b> .
Regards,
Bhavesh
Add a comment