Former Member
Oct 25, 2006 at 09:30 AM

Alternative material during MRP run.

262 Views

Hi all,

We have requirement as below:

Out client has a two similar material A & B.

When MRP is runned it should check the material A, if no material is exist then it should check Material B.

If material B is exist then it should plan for reservation, and if thatÂ’s not enough to available to promise, then it should create a planned order for remaining quantity for A material only.

We have checked with alternative item group in BOM, its not suits our requirement as we have to give 'Usage probability'.

Thanks with regards,

Raghavendra K