Skip to Content
0
Former Member
Oct 23, 2006 at 03:35 PM

Phantoms in BOM

153 Views

Hi all

I'm trying to cost a material which has a phantom in the BOM.

Can someone clarify if the phantom needs to be costed at all..? I mean, does "no costing" indicator need to be set in costing 1 tab of material master..?

Can someone explain this please?

Thanks very much