Skip to Content
author's profile photo Former Member
Former Member

need help for creating a production order for the planned order.

Hi,

Please help me if any body know the solution for the below queries.

My requiremnet is i have to copy the routing operational classification to production order operation needs to be enabled.

the second requirement is to include the classifications of the production order operations in CS01 & CS02.

1.is it posssible to create the characteristics of the routing in the Production order?

2.Whether the same class configuration characteristics definition possible in production order?

Please help me if anybody know teh solution for this problem.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 23, 2006 at 12:41 PM

    Also please let me know if there is any BADI/user exit avilable for this enhacement.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.