I have multiple level 1 WBS Elements in my project structure. Each level 1 WBSEs has multiple lower level WBSEs. Lets call them Legs (Level 1 WBSE + its lower level WBSEs). Each level 1 WBSE uses different Profit Center which gets copied to all the lower level WBS Elements under that level 1 using standard substitution rule.

I have maintained PCs on Standard Project Template. When I create NEW Operating project using Standard Project template then the PC is getting copied to level 1 WBS elements and is then substituted to lower level WBSEs. But if I append my Operating project structure i.e. I would have created 2 Legs initially and now I am adding 3rd Leg in the structure, using standard WBSE template (this is a corresponding Leg in standard template), the Profit center does not get copied. I checked it that it gets inherited from Operating PD which is blank.

There is a related Note 841694 but that note is only for Appropriation Request.

I would really appreciate your help here.

Regards,

Viraj

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers