Skip to Content
author's profile photo Former Member
Former Member

Delta Upload Problem

Hi All,

Supposed a delta upload to two data targets (infocube A and infocube B) but somehow the previous delta only uploaded to infocube A. Now when I do a new delta upload

to both data targets, the system give an error message that previous delta is not updated in infocube B and now I couldn't upload a new delta to infocube B.

The previous delta is upoaded directly to data target and not in PSA. How can I re-upload the previous delta again? Is anybody have any ideas?

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 17, 2006 at 06:33 AM

    Hi,

    Try to convert the previous delta technically to RED and then try to reload the data with repeat.

    Hope this helps

    Assign points if useful

    Regards,

    venkat

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 17, 2006 at 06:56 AM

    Hi Andy,

    You have to delete the previous delta load request from IC A and run one single run as a repeat delta to both the targets. It won't give any error for the future deltas also.

    Hope it helps.

    Regards,

    Srikanth.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 17, 2006 at 06:57 AM

    You mean turn it to RED under Monitor screen or the request in the data target?

    If under Monitor, do I need to delete the request from data target before proceed to repeat delta?

    Thanks.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 17, 2006 at 05:20 PM

    Hi,

    First try to find out the root cause of the failure, otherwise you are going to get into the same toruble. Would also recommend having a PSA, so that you can fix errorenous data as well.

    Follow the steps below for a repeat delta :

    1. Mark the QM status of the request red even if its red in the monitor. Goto the request , status tab and click on the traffic lights. A pop up window will give you options for the red traffic light, click the radio button for the red traffic light and click the green check mark.

    2. Goto the data target and back out the request from there.

    3. Go back to the delta infopackage and execute the job again. It'll ask for a repeat delta. Click ok. The repeat delta would be executed.

    4. Once that is successful, the normal deltas continue to work fine.

    Cheers,

    Kedar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.