Could I call the split button using PDI tool?

former_member200995
Contributor
0 Kudos

Hi experts,

  • 1.In Production Control - Task Control, choose 130, “Confirm”
  • 2.At “Input Products”, these is a button “split”
  • 3.Now I want to call the button “split” using the PDI tool, how can I do?
  • 4.And I want to assign a default value to the Identified Stock ID, how can I do?

Thanks a lot.

Benny

Accepted Solutions (1)

Accepted Solutions (1)

HorstSchaude
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello Bin,

You need to detect which action is call when you click on the "Split" button.
If you are lucky, it is only an action and this action is PSM released.

Then you can call it from ABSL too.

If is more frontend scripting or the action is not released, then - I am afraid - it is not possible.

HTH,
. Horst