Skip to Content
0
Former Member
Oct 12, 2006 at 05:55 PM

IPC Configuration

45 Views

Our Basis team is trying to install the IPC. All the steps in the setup guide have been followed until initial data-upload per the installation guide. We defined an R/3 system and a local database.

When the download is initiated or even the connection is tested, the connection fails with a R/3 terminating with a short dump in the CRM_SEND_DATA function module. Has anyone made faced this issue?

First of all when there is no material master does the IPC have to connect to the R/3?