Hi All,

I have a scenario where we are able to see planned cost for an item which is not extended or is physically at the location,But we need to get the cost for the materials reserved/requested from different plant.

we will have parts at central location being reserved from different plant locations.

For Instance:

This work order #2000000 is not showing planned costs for material because it has reserved material from another plant.

Please check the screenshot for reference.

planned cost is only showing for the plant for which Order is created and material is reserved from the same plant.

The cost of materials from other plant are not captured.

Is there any configuration we need to implement or go for custom devlopment.

Accepted Solutions (0)

Answers (8)

Answers (8)

peter_atkin
Active Contributor

Your order has a costing error (status CSER).

Check the error log via IW33->Goto->Logs->Cost Determination

PeteA

Former Member
0 Kudos

cost-log-empty.jpg

We see the CSER status but also can not see any log in cost determination..

peter_atkin
Active Contributor
0 Kudos

Do a re-costing by clicking the "Determine Cost" button in the order header, then check the log

PeteA

Former Member
0 Kudos

Thank you Pete.

I got the cost log error and seems to be quite informative.

Screenshot attached.

What does this say :If price are maintainederror-log.jpg then the plan cost will come for the material reserved from different plant in if cross company code is active.

peter_atkin
Active Contributor
0 Kudos

Talk to your MM Team who should be able to help with these errors.

PeteA

Former Member
0 Kudos

Thank you Pete for the suggestion .

It was a nice post to discuss.

peter_atkin
Active Contributor
0 Kudos

I've never seend the UserFields tab active before on the ordr header.

Can you send us a screen-shot please. Also, do you know how it was activated?

PeteA

Former Member
0 Kudos

user-field-tab-order.png

Hi Pete ,

This tab is designed by SAP for specific Business scenario when WEC module is implemented.

THis can be done by configuration.

peter_atkin
Active Contributor
0 Kudos

What is WEC??

Do you know how WEC was implemented?

PeteA

Former Member
0 Kudos

This Work Efficiency component module by SAP for US client.Mostly used by Nuclear business.

peter_atkin
Active Contributor
0 Kudos

Well, it does seem I knew about it - here's an old post from 2005:

http://www.sapfans.com/forums/viewtopic.php?f=7&t=167027

peter_atkin
Active Contributor
0 Kudos

If I enter a material in the order from a different plant than the order planning plant, then costs are determined from the new plant. So it works fine in my system.

Are all the plants in the same company code/controlling area?

You shouldnt need to create/extend the materials to each plant, only in the central plant (assuming the same company code/controlling area).

PeteA

Former Member
0 Kudos

The company codes for maintenance plant and the material master plant is different.

Does the material planned cost flow while doing reservation during entering the material.

avnikant_singh
Explorer
0 Kudos

he company codes for maintenance plant and the material master plant is different.

Is there configuration to maintain for cross company transfer.

Do we need to maintain OKYV for this functionality ?

Former Member
0 Kudos

Hi Pete,

have you checked the scenario?

We need to get the planned cost in Plant A if material is reseved in Plant B,without extending the material to Plant A.

Former Member
0 Kudos

Hi Pete,

Is there any configuration to show planned cost in order if material is taken form another plant (diffrent company code.)

peter_atkin
Active Contributor
0 Kudos

Can you please post a screen-shot of the Control tab of the PM/CS order.

PeteA

Former Member
0 Kudos

order-cost.jpgPete,

The issue is business does not want to extend the material to all plants.

They need to reserve materiel from different plant.

and as per my understanding Plan cost is calculated at time of reservation.

Now is there a way to show the planned cost in order cost tab when material is reserved from diffrent plant.

Attached is the control tab component and cost tab:

order-component.pngorder-control.png

Former Member
0 Kudos

I am able to see the Actual cost after issuing the goods but am not able to see the planned cost.

Former Member
0 Kudos

Can you also put the screenshot of Cost determination Log?

Former Member
0 Kudos

There is no cost log. screenshot attached.

The requirement is:

View the planned/actual cost in work order (created for plant1) of a material reserved in plant 2.

is there a way /concept to implement this scenario.

check the cost for materials (plant 2) reserved for a work order created for cost-log.jpg(Plant 1).

peter_atkin
Active Contributor
0 Kudos

Are you getting any costing errors?

PeteA

Former Member
0 Kudos

No there will be no costing error.

But this is new requirement for business.

I am not sure if Warehouse management has to be implemented to achive this business process and go for STR/STO process.

ulhas
Explorer
0 Kudos

Hello Sir,

To try with special procurement key config. alternative plant and assign to the material master.Also BOM/Routing found two alternatives plants.

Best Regards

Former Member
0 Kudos

So, there is no configuration to control the material plants in PM?

Former Member
0 Kudos

is this a configuration in MM or Warehouse management?