Former Member

material cost in work order

Hi All,

I have a scenario where we are able to see planned cost for an item which is not extended or is physically at the location,But we need to get the cost for the materials reserved/requested from different plant.

we will have parts at central location being reserved from different plant locations.

For Instance:

This work order #2000000 is not showing planned costs for material because it has reserved material from another plant.

Please check the screenshot for reference.

planned cost is only showing for the plant for which Order is created and material is reserved from the same plant.

The cost of materials from other plant are not captured.

Is there any configuration we need to implement or go for custom devlopment.

order.png (58.4 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

8 Answers

  • Apr 11, 2017 at 07:47 AM

    Your order has a costing error (status CSER).

    Check the error log via IW33->Goto->Logs->Cost Determination

    PeteA

    Add comment
    10|10000 characters needed characters exceeded

  • Mar 31, 2017 at 05:15 AM

    Hello Sir,

    To try with special procurement key config. alternative plant and assign to the material master.Also BOM/Routing found two alternatives plants.

    Best Regards

    Add comment
    10|10000 characters needed characters exceeded

  • Mar 31, 2017 at 06:57 AM

    Are you getting any costing errors?

    PeteA

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      No there will be no costing error.

      But this is new requirement for business.

      I am not sure if Warehouse management has to be implemented to achive this business process and go for STR/STO process.

  • avatar image
    Former Member
    Apr 06, 2017 at 05:36 AM

    Can you also put the screenshot of Cost determination Log?

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      There is no cost log. screenshot attached.

      The requirement is:

      View the planned/actual cost in work order (created for plant1) of a material reserved in plant 2.

      is there a way /concept to implement this scenario.

      check the cost for materials (plant 2) reserved for a work order created for cost-log.jpg(Plant 1).

      cost-log.jpg (132.1 kB)
  • avatar image
    Former Member
    Apr 10, 2017 at 09:54 PM

    I am able to see the Actual cost after issuing the goods but am not able to see the planned cost.

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 18, 2017 at 09:23 AM

    Can you please post a screen-shot of the Control tab of the PM/CS order.

    PeteA

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 27, 2017 at 06:57 AM

    If I enter a material in the order from a different plant than the order planning plant, then costs are determined from the new plant. So it works fine in my system.

    Are all the plants in the same company code/controlling area?

    You shouldnt need to create/extend the materials to each plant, only in the central plant (assuming the same company code/controlling area).

    PeteA

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 27, 2017 at 10:42 AM

    I've never seend the UserFields tab active before on the ordr header.

    Can you send us a screen-shot please. Also, do you know how it was activated?

    PeteA