Problem in Assembly Processing in Project System(WBS is required in SO)

Mar 30, 2017 at 03:36 PM

38

avatar image
Former Member

I have done SAP setting according to the link below.

https://wiki.scn.sap.com/wiki/display/PLM/Assembly+Process+in+Project+Systems

When I create SO, WBS element is required. If I input the WBS I created, Error Msg CN044 is shown.

How can I solve this problem?

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

avatar image
Former Member Mar 30, 2017 at 05:30 PM
0

Hi Wan,

Did u assign material to standard network in cn08. This scenario should automatically create WBS. If possible please paste the screen shots of the config you have.

Thanking you

Vengaiah

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Apr 03, 2017 at 08:22 AM
0

Hi Vengaiah

Thank u for your help.

I know why I need to input WBS when SO is created.

When I defined fields selection for networks, I have set WBSE as required.

Thank you.

Wan