Hi All,

Our requirement is that we have to create 2 inspection plans for the same material. Both plans will be in active mode. At present the system create the inspection lot in CRTD mode. But we want system should create the lot in REL mode automatically. Condition is that we have to Inspection plans Plan A & Plan B, for first 15 batch system atomically select Plan A and for 16 Batch system should select Plan B, so in this why every 16 batch system should select Plan B. In this way we will get the Inspection lot in REL mode.

So let me know is this possible by customizing .If yes then what changes I need to do.

Regards,

Asif Saiyed