Hi
We have ECC6.0, BI and EP7.0 (Nw2004s) in 3 different boxes (one for each). The Sld is configured in the BW box. Now I would like to configure the SLD in the EP box.
Is there way where I can transport the SLD to the Ep system? If yes How?
Also if I create a 2nd SLD in the network will i cause any problem, what are the considerations I need to make.
please let me know
Thank you
-Regards
Luke