Skip to Content
avatar image
Former Member

Quota correction update in time evaluation

I am trying to use Quota Correction infotype. I increased the absence quota (eg: annual leave) by 1 day with X transfer collected entitlement immediately. Once the time evaluation is run for the pernr, the absence quota's is doubled by 2 days. It is increasing in 1:2 ratio and I also checked in IT2006. Pls provide your guidance

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Apr 03, 2017 at 11:48 AM

    Hi Vaishnavy,

    Before PT60, make sure these things are properly maintained.

    1. If the absence quota is generated and transferred daily into IT2006 then in that case, check the daily quota generation based on that enter the quota correction number.

    2. secondly before PT60, In IT0003 change the PDC recalc date as same date provided in IT2013.

    Add comment
    10|10000 characters needed characters exceeded