Hi all
Please tell me if I'm doing it right, if so what's the solution for the following?
I'm trying to issue material to a rework order along with booking labour costs to it. This rework order is created with reference to a material(co01). The costs of the rework order are settled to the original order.
During settlement of rework order,in the allocation structure I'm able to pass on labour costs to the original order, but not able to work out the logic to settle the material costs to the original order. These material costs cost element is a primary cost element.
Can someone help along with the steps as to how the allocation structure be configured to settle the material costs to the original order?
Thank you very much