cancel
Showing results for 
Search instead for 
Did you mean: 

IR before GR on a PO with a delivery schedule

Former Member
0 Kudos

I have the following scenario.

We order a large quantity of material from an overseas vendor and receive the IRs before the GRs take place. The PO is setup with the GR-Bsd IV turned off and the IR is posting with out issue in blocked status. What I want to know is when we receive the corresponding GR for the IR and run MRBR in the background it will not release the IR unless all of the GRs are posted.

For example:

We will have three IRs posted and 1 corresponding GR. The business process being requested is to have the MRBR background job release the 1 IR where the GR has posted. Currently in our system MRBR is ignoring the IR where the GR is posted.

Accepted Solutions (0)

Answers (0)