Automatic creation of a project by SD order

Mar 27, 2017 at 03:44 AM

222

avatar image

Hello,

I hope somebody can help us.

We are currently trying to implement an ETO process in SAP. The following Video serves as template: Engineer to Order Manufatcuring with SAP Business All-in-One.

In addition, we have configured all necessary dependencies with the help of the SAP Best Practice Guides. The material was also linked to the WBS and a network was also created and linked.

Nevertheless, an automatic project is not generated from an SD order. So far, despite all efforts, we have not yet been able to find the problem.

We would be happy about new ideas on solving the problem

Best regards

Christopher

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

5 Answers

Jyoti Prakash
Mar 27, 2017 at 04:17 AM
0

What is the requirement type getting determined in your Sales Order?

Thanks, JP

Share
10 |10000 characters needed characters left characters exceeded
Vengaiah Chowdary Pachava Chinna Mar 27, 2017 at 05:10 AM
0

Hi Christopher,

And also check whether you maintained settings in cn08 tcode.

Thanking you

Vengaiah

Share
10 |10000 characters needed characters left characters exceeded
Christopher Partsch Mar 29, 2017 at 10:09 AM
0

Hi,

Thanks for your help.

@Jyoti: I used the following Best Practices 232_Guide. At point 3.2.10 Determining Requirement Type i maintaines the requirement type 031 - Order Requirement. Do you mean an other requirement Type or is there an other transaction to maintain the req. type?

@Vengaiah: I have maintained all settings in cn08 Tcode.

Maybe i have found the problem and i know how to solve it. (watch here: Commercial Project Inception: Process Control)

I have to maintain the settings in cn08ci tcode. But there is a new Problem. If i open the tcode CN08CI i get an error message that the Business Function LOG_SD_CI_02 is not activated even though the Business Function an all his dependicies are activated (tcode SFW5).

Do u have any ideas to solve the problem?

Best regards

Christopher

Show 2 Share
10 |10000 characters needed characters left characters exceeded

SAP All-in-One is a different product than SAP ECC that the tags you've chosen relate to. You might want to add some All-in-One specific tag. I can't comment on that product, unfortunately.

In general, if you've activated a business function but are getting a message that it's not activated I'd just go straight to SAP Support.

0

Hi Jelena,

Thanks for your answer.

I have researched a little bit about the difference between SAP All-in-One and SAP ECC.

SAP All-in-One and SAP ECC are the same products but SAP All-in-One has preinstalled Building Blocks for different industry Sectors.

Best regards

Christopher

0
Vengaiah Chowdary Pachava Chinna Mar 30, 2017 at 05:33 PM
0

Hi Christopher ,

You have activate the business function in SFW5.

Thanking you

Vengaiah

Show 1 Share
10 |10000 characters needed characters left characters exceeded

Hi Vengaiah,

The Business Functions required for the TCode CN08CI are activated but i can still not use the TCode because i allways get the error message that the required Business Function is not activated.

Best regards

Christopher

0
Vengaiah Chowdary Pachava Chinna Apr 03, 2017 at 01:05 PM
0

Hi Christopher,

Can you please goto table sfw_active_b2. and check whether business function is there with Version A.

Thanking you

Vengaiah

Show 1 Share
10 |10000 characters needed characters left characters exceeded

Hi Vengaiah,

I checked the table sfw_active_b2 and all required business functions (SD_01, LOG_SD_CI_01, LOG_SD_CI_02, LOG_SD_SIMP_02) are active and displayed as Version A.

Best regards

Christopher