Hi All,
If I have the DEV and QA in the same box and the sid s being EXD and EXT respectively pointing to the same technical system. Should we assign the role of Integration server to both the business systems or EXD should be integration server and EXT being the application system?? Hows it work for a single SLD for Dev and QA?