material Scheduling Via Routing - in-house production time ca96 LO-VC

former_member227943
Participant

Dear Experts

kindly i need help .. i am working with Variant Configuration Solution

my requirement i need to update the Material Master ( Variants ) with the in-house production time i created the super routing and assigned the material variants to the super Routing ( Material Assignment ) , the problem that i maintained a selection condition on the operations based on the Characteristics Values for the material variant , but when i make scheduling
Ca02 > Extras > Scheduling >scheduling results

ca96 > update material master

the system neglect the Selection condition and propose that the Material variant will be produced on all the operations in the super routing .. which is wrong and lead to wrong processing time , I am afraid that the update material master not working with Variant Configuration ( super routing )

please Advise

Regards

Hussam Ghanem

Accepted Solutions (1)

Accepted Solutions (1)

Ritz
Active Contributor

Hossam Ghanem,

Please again use CA02 and select routing for material variant and check what operation you see. My guess is operation are not selected for material variant and thats why you can see all operations instead of just the eligible one's.

Thanks

Ritesh