Skip to Content
avatar image
Former Member

Actual cost in PS activity for a item rate contract

Dear Experts,

I have a requirement where the actual cost should be captured based on the work confirmed in an activity type for labour in PS Activity.

For example. Total work of Concrete is 1000m3 and the labour cost per m3 of concreting is Rs.700/-. if i confirm the activity with quantity 500m3. The actual cost of the labour should be 500*700=350000.

Any idea of doing this

With Regards

Sangeeth