Copy SLED from Material A to Material B

Mar 21, 2017 at 09:59 AM

78

avatar image
Former Member

Dear Team,

I would like to copy the SLED date of material A (MCHA - VFDAT) to Material B.

While doing so, what are the conditions / factors to be taken care for Material B?

To copy the SLED from Material A to Material B, should i need to maintain the Shelf life data in material master of material B?

Thanks

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

5 Answers

avatar image
Former Member Mar 21, 2017 at 10:53 AM
0

Dear Selva,

Transferring batch characteristics from one material batch to another can be done thorugh Batch Derivation

please refer the below threads for better understanding

https://blogs.sap.com/2013/02/18/batch-derivation-overview-with-example/

https://blogs.sap.com/2014/01/23/batch-derivation-in-production/

Regards,

Venkatesh

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Mar 23, 2017 at 07:12 AM
0

Dear Venkatesh,

Thank you for the link. I would like to copy the SLED of the raw material to header material during MFBF (REM confirmation). But in DVCO transaction, i do not have derivation variant for REM Confirmation (MFBF). How to add derivation variant for REM confirmation in DVCO?

Thanks

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Mar 23, 2017 at 09:10 AM
0

Hi,

Please check Under Repetitive manufacturing profile ( Tcode OSP2)--> Control tab 2->Maintain batch search procedure.

DVCO is not mandatory step.

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Mar 23, 2017 at 04:33 PM
0

Hi

To copy SLED from material A to material B , Is both the materials to mandatorily batch managed?

Thanks

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Mar 24, 2017 at 03:40 AM
0

Hi Mangesh,

Could you please help me to explain, how using the "Batch search procedure" in REM profile, the SLED can be copied from material A to material B?

Thank you for your valuable info

Share
10 |10000 characters needed characters left characters exceeded