We have a requirement to allow multiple Materials in a single Storage Bin but not to mix the bin with multiple Batches.

Reason: If different batch of same item able to store in same storage bin, then user will easily pick the wrong batch item.

If I set the Mixed Storage then the system will allow to store both multiple materials and the multiple batch, Is there a standard way to not allow multiple batch of material? Diffferent materials can be allow but different batch of same material shouldn't be allowed.

Accepted Solutions (0)

Answers (1)

Answers (1)

MANIS
Active Contributor
0 Kudos

With standard SAP it is very difficult to get the desired result. My suggestion is you need to write your own piece of custom code in user exit MWMTO003 based on your requirement