Skip to Content
0
Former Member
Aug 21, 2006 at 11:26 AM

seial number creation for matrial

30 Views

we have a material which has tert :A: as header material and materials :B: and :C: halb bom materials. In the work scheduling view of the material a :Serial number profile OF category MMSL with material no creation obligatory was assigned. At the time of confirmation of goods production for halb material B & C wide movement type :101" besides sl nos ,Equipment nos are also getting created. How to stop the creation of Equipment nos in the back ground.

Thanks in advance

suryanarayana