Hi All,
The issue here is that, the Dev-Solution Manager DSM (3.2 version) is defined as an domain controller for its transports.
We want to connect this to a satellite system R/3 termed as Dev-100, and this system is too a domain controller for its own transports, i.e. connecting Dev-100 --> Tst-100 --> PRD-100.
Now, when I want to configure change management to these systems, where do I configure the setup ? In Dev-SM STMS or in Dev-100 STMS ?
Currently, as both of them are domain controllers, they both are linked to each other using domain links, and this is done in Dev-100, but this does not seem to work.
Are we doing something wrong here?
How do we set up change management in this scenario?