Hi,
We are implimenting PDP scenario between R/3 4.7 and SRM 5.0.
When we create Requistion with delivery date say for example 25.08.2006 and transfer it to SRM on 14.08.2006(Transfer Date) by running report BBP_EXTREQ_TRANSFER the requistin doesn't get transfered to SRM system.But if i change the transfer date equal to delivery date the requistion gets transfered.
What needs to be done so that all the requsitin as on tranfser date gets transferd irespective of delivery date.
Regards
Pritesh
Hi Pritesh,
This is related with the table EPRTRANS in R3.
Your not transferred PR would be pending in this table.
There is some date setting there you need to do (sorry but I don't remember & can't simulate)
Once done should resolve yr problem .
BR
Dinesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This transfer date is utilised in R/3 program BBP_EXTREQ_TRANSFER which transfers all requirements logged in table EPRTRANS with a transfer date equal or lower to the date specified in the selection screen. To ensure that all external requirements are captured and transferred as soon as possible, the transfer date should be 31.12.9999. This way, even if the delivery date is months ahead, the requirement will be transferred to EBP at the earliest opportunity.
Kenny