Hi guys,

1. I have a requirement in which the reservation must check for the budget at the time of creation.I have made all the necessary integration settings but still it goes through without checking the budget.

2. Using the BCS, is it possible for the Purchase Requisition to only check for the budget at the time of Release?If so how, coz all my settings are not coming into effect it seems.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Aug 04, 2006 at 10:35 PM

    Is this question in regard to funds management and if so, do you want the availability control trigered when a purchase requisition is created (I don't know what you mean by release) if so which budget- commitment or payment budget?

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      I have done what you advised me to do but still it didnt work and there is still this issue of the MM reservation being subjected to availability control.The reservation must check for the budget at the time of creation.

      any idea of how this can be achieved?

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.