I have a ODS A from which I have done initialization and I am pulling delta to another ODS B. Now I have a requirement to incorporate a new ODS C whose source is to be ODS A. Is it possible to do an initialization or full load from ODS A to ODS C and then subsequently pull delta to ODS C as already daily delta is happening from ODS A to B. Any suggestions in this regard will be very helpful.

Thanks

Akhila.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Aug 03, 2006 at 06:46 PM

    Yes.

    Do a full load from A to C. Next, run a delta init (without data) for the same. Next schedule the delta (maybe in the same infopackage as B). That is all you need.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 03, 2006 at 06:46 PM

    Hi,

    Yes its possible. Do a full load from ODS A to ODS C, so that your data is caught up. Then delete the initialisation from ODS A to ODS B. Do a initialization without data transfer from ODS A to both ODS B and ODS C. Reset the delta. You'll be all set.

    Cheers,

    Kedar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.