cancel
Showing results for 
Search instead for 
Did you mean: 

Mass reversal using f.80

Former Member
0 Kudos

hi guys,

i have to do mass reversal using TCode f.80 on first friday of each period for transaction of some specific document type for previous period duration. like for period 01.06.07 to 30.06.07 on next period's first friday i.e 07-07-06 for doc type za. I know i can se variant for this selection in my abap prog to include t.code f.80. Any suggestion on this how to prepare a abap prog to run this scheduled job??

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

You can set up a variable for the date in the TVARV. Use this within your scheduled job in order to have the date change.

pls assign points if helpful as a way to say thanks.

Former Member
0 Kudos

Hey thx for your reply but I could'nt get what is TVARV and how can I set up a variable for the date in the TVARV. I will be thankful to you , if you can explain in detail about this.

anyway I can do this through SM36 to schedule for every friday but I don't know how to select previous period every Friday for current week and so on .... Like for 1 ( 01.06.2006 to 30.06.2006) rerversal sud be done every friday if period 2.. and for period 2 ( 01.07.2006 to 30.07.2006) ..in period3 (all fridays)

reply ASAP

Thanks & Regards,

Arun