on 08-03-2006 11:48 AM
Hi,
Without confirming a production order the system allows to do GR ( 101) for the production order.
How this can be controlled ?
Regards
Valavan.B
Hi Valavan,
It is suggested that you do GR only by CO11N & Gr against Production be blocked in MIGO.
regards,
Mohit Goyal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
GR ( 101) was done using MIGO. But its not checking for confirmation of the production order.
I created a Prod.order and immediately do a GR for that order. System do not check for the confirmation .I can able to post.
Regards
Valavan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Valavan,
Can you tell from which t code you are doing 101 for production order?
regards,
Mohit Goyal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.