Hi,

We have an XI 3.0 SP17 system and we're in the middle of development. We would like to move to PI 7.0 SP8 and are wondering the best method to do this:

1) Can we install a new PI 7.0 system and then transport XI IR and ID from XI 3.0 to PI 7.0 using CMS or the filesystem?

2) If this isn't possible, has anyone done an upgrade from 3.0 to 7.0? Do we have to go through the complete NetWeaver ABAP and JAVA upgrade guides which seem very extensive?

Thanks,

Jesse

Add comment
10|10000 characters needed characters exceeded

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 01, 2006 at 08:22 PM

    Wolff -

    Did you check this thread:

    Upgrade XI 3.0 SR1 to XI 7.0

    Thanks,

    Tirumal

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thanks Tirumal.

      I've seen the XI 7.0 threads but I haven't found any information that answers my questions:

      1) Can we install a new PI 7.0 system and then transport XI IR and ID from XI 3.0 to PI 7.0 using CMS or the filesystem?

      2) If this isn't possible, has anyone done an upgrade from 3.0 to 7.0? Do we have to go through the complete NetWeaver ABAP and JAVA upgrade guides which seem very extensive?

      Thanks,