Skip to Content
0

Sales Order Costing & Multi-Level BOMs with Phantoms

Mar 14, 2017 at 02:22 AM

45

avatar image
Former Member

Hi,

In a complex BOM structure include phantoms we are getting a red traffic light at a lower level in Sales Order Costing which is carried to the higher level product (which happens to be a phantom). This red traffic light is not carried up to the next level and to the very highest level and as a result the order is considered as COSTED but it is costed incorrectly.

Any ideas why? We want to see a red traffic light at the top if there is a red traffic light anywhere

Thanks, NW

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers