on 07-28-2006 1:54 PM
Hi,
I am facing the following problem :
My requirement is to load from APO in BW...
When I schedule the load in BW, it is failing..
In the "Step-by-Step Analysis" tab on the monitor screen, I see the "RFC Connection Successful" as grey...
I checked the RFC connection.They seem to be fine..( In fact, i tried loading data from the same source system for another Cube and it completed successfully"...)
I have done the "generate DataSource" in APO and then "Replicate DataSource" in BW.Also, run the ACTIVATE_TRANSTRUCTURE.." program as well..but to no avail.
The load was running correctly few months back..but now, for some reason it is not..
Can you plz help me with this..
Thanks in advance,
Punkuj..
Hi Punkuj,
Please check the authorizations for the ALE user that is used for connectivity between the 2 systems. Hope this helps.
Thanks and Regards
Subray Hegde
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Punkuj,
Not necessarily. I would follow Subray's suggestion here and check for the ALEREMOTE authorizations as we had some problems for some of the loads but not others even though the background user was the same. We found that for that particular interface, the user was missing some authorizations. If you say it was working fine some time back, then I would probably go and run a SUIM report to check the change documents for the ALEREMOTE user to check and see if any roles or profiles were added, deleted or altered. Might give you a clue.
Cheers
Kedar
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.