Revaluation of Standard for Procured Intraco Split Valuation

Former Member
0 Kudos

Hello experts, We manage materials with different valuation type. For example: Material 12345 has price control "V" and 2 splits with price control "S". Each one of these splits have a different Valuation type. The material has been extended from a different plant under the same company (intra co). So the material would be procured with a STO instead of a normal PO. Now, we need to update the Standard price for each one of these splits. I've been told by my managers that it is not possible. Is there a way to do this?

The steps I take to extend the material using mm01 is to first copy the material from another plant and change the price control and determination and standard price V2. Then I copy the same material from my plant and add a valuation type. I will change the price control and determination S3. I do this for both splits.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

There has to be more to it than that, becuase I'm sure they would have already done that.

former_member183424
Active Contributor
0 Kudos

In MR21 , you have the field to give valuation type for a material.

Former Member
0 Kudos

There has to be more to it than that, becuase I'm sure they would have already done that.