cancel
Showing results for 
Search instead for 
Did you mean: 

SAP APO Event trigger activity

Former Member
0 Kudos

Hello Experts,

Need your input. currently we have a background job activity that we would like to assign it to the event trigger which is already created in the system, but how can we make the background activity to run based on the event trigger, as of now I have to manually assign the job to schedule mode (MC8G)than I can trigger the event to run the job, but when I trigger the event the second time it doesn't run at all in sm37. is there a way to make this automation so anytime I want to pull the event trigger it should run automatically in sm37. I have also went to sm36 to assign the event trigger to the job but I stll have issue.

Accepted Solutions (0)

Answers (0)