S4HANA system for PPDS module new set up of Material master is not getting mirrored Product Master

Mar 09, 2017 at 12:00 PM


avatar image


We are setting up the PPDS part for a particular plant as testing senario in S4 HANA system. As per the SAP notes

2382787 - We don't need to CIF the Material Master to get the relevant PPDS Product Master in same S4 HANA system within its client. We have done the setup of Material Master for the particular Plant and the live cache settings were kept properly, Advance planning check has been enabled in the Material Master, still the Product master for that Plant is showing not exist for the location. Since the Location master has been transferred through CIF as suggested by SAP in the Implementation Notes . We could able to see the Global master data for that Particular Product .

Please suggest any settings missed from our end or the cause for the Location Product master doesn't exist.

Thanks & Regards

Ameer Khan S

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

SUPPORT TEAM Aug 06, 2017 at 08:46 AM

Share the CIF master setup details

10 |10000 characters needed characters left characters exceeded
Lingaiah Vanam Sep 17, 2017 at 05:55 PM

Hi Ameer,

Material master not required to transfer to PPDS. Check the target system, CIF, Queue settings once again.

You have to define the model and version first.