Hi,
We are setting up the PPDS part for a particular plant as testing senario in S4 HANA system. As per the SAP notes
2382787 - We don't need to CIF the Material Master to get the relevant PPDS Product Master in same S4 HANA system within its client. We have done the setup of Material Master for the particular Plant and the live cache settings were kept properly, Advance planning check has been enabled in the Material Master, still the Product master for that Plant is showing not exist for the location. Since the Location master has been transferred through CIF as suggested by SAP in the Implementation Notes . We could able to see the Global master data for that Particular Product .
Please suggest any settings missed from our end or the cause for the Location Product master doesn't exist.
Thanks & Regards
Ameer Khan S
Hi Ameer,
Material master not required to transfer to PPDS. Check the target system, CIF, Queue settings once again.
You have to define the model and version first.
Best Regards,
Lingaiah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Share the CIF master setup details
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
24 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.