Hi experts!

When I create a general task list for PM (IA05) and I directly assign components without a BOM, all the components are assigned with type "L", all the fields are grayed out and I can't change the information. I couldn't find these fields in the field status configuration and I already assigned type N proposed for all the plants in customizing. Is there a way to solve this?

Thanks!

Accepted Solutions (0)

Answers (1)

Answers (1)

paul_meehan
Advisor
Advisor
0 Kudos

Hi,

It is not possible to add a non-stock component directly to the task list. The only option therefore is to do this through BOM assignment.
Note 441577 has more information.


-Paul