on 03-07-2017 6:49 PM
Hi experts!
When I create a general task list for PM (IA05) and I directly assign components without a BOM, all the components are assigned with type "L", all the fields are grayed out and I can't change the information. I couldn't find these fields in the field status configuration and I already assigned type N proposed for all the plants in customizing. Is there a way to solve this?
Thanks!
Hi,
It is not possible to add a non-stock component directly to the task list. The only option therefore is to do this through BOM assignment.
Note 441577 has more information.
-Paul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.