Dear Friends:
The Quantity based overheads which are entered in the costing sheet are not flowed when doing the Costing Run CK40N or the Standard cost estimate CK11N. The itemization for COGM in the cost component structure doesn't include category G i.e., overheads broken down into Supervisory cost, Utilities, Depreciation, other overheads in the costing sheet. The itemization includes only category E and M in the cost estimate. This has occurred after the change in PP master data from Routing to Master Recipe i.e., change from Repetitive to Process manufacturing. The rates per hour are existing in the costing sheet quantity based rates. But still are not flowing to the standard cost estimate.
How to overcome the problem?Please advise.
Regards
MSReddy