cancel
Showing results for 
Search instead for 
Did you mean: 

Bill Of Service - SD - easy cost planning - Lot Size

former_member227810
Participant
0 Kudos

Dear Experts,

Facts :

I am Uploading BOQ to model specification with quantities.

in configuration we set Lot Size to 1. its working fine cost estimation with quality 1

Issues:

In VA21 cost estimate while we copy service from model Spec lot size is considering as quantity which we mention in line item we always required lot Size as one in all cases, while copy sevices from other qoutation or model spec always we required lots size to 1 in Cost estimation.

Please guide us, thanks in Advace,

Sadeq Ahmed

Accepted Solutions (0)

Answers (0)