Hi Team.

I am doing a Production Order confirmation in CO11N Transaction.

The issue i face is that during production Order confirmation, the sort rule is not working and component batches are not being picked as per FEFO. Also if i have a restricted batch in control cycle bin it is getting issued during back flush.

1. My WM-PP Interface is active.

2. In control cycle the component is maintained as "Manual Staging".

Thanks and Regards

Chitradeep

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Manish Kumar Mar 08, 2017 at 09:33 AM
0

Looking at the thread I am not clear since " the sort rule is not working" and "component batches are not being picked as per FEFO."

To the best of my knowledge the flow for line side transfer is (Please let us know if the flow is different what you are using)

1) Create production order / Process order

2) Release production order

3) WM material staging (which create TR)

4) Create TO against TR (Here the picking strategy defined that will be considered, please check your setting under LE--WM-Strategies-Define storage type search)

5) Confirm TO

6) Confirm Production order

Show 1 Share
10 |10000 characters needed characters left characters exceeded

Hi Manish.

Since the staging indicator is "4" in my control cycle no " TR will get generated" when production order is Released.

The flow for manual staging of material is as below

1. Create a manual TR and Transfer materials to control cycle Bin.

2. Create Production Order.

3. Release Production Order.

4. Confirm Production Order in CO11N during which system checks the control cycle bin for component batches and the Batch split should happen as per sort Rule.Suppose i have Batch A (SLED 04/30/2017),B(SLED 05/30/2017).The issue i face here is as below

a) The SORT Rule at IM level do not work to select as per FEFO.

b) The SORT Rule at WM level do no work to select Batch as per FEFO.

c) Restricted Batches are also determined.

Thanks and Regards

Chitradeep

0
CHITRADEEP DUTTA Mar 08, 2017 at 06:54 PM
0

Hi Team.

Since the staging indicator is "4" in my control cycle no " TR will get generated" when production order is Released.

The flow for manual staging of material is as below

1. Create a manual TR and Transfer materials to control cycle Bin.

2. Create Production Order.

3. Release Production Order.

4. Confirm Production Order in CO11N during which system checks the control cycle bin for component batches and the Batch split should happen as per sort Rule.Suppose i have Batch A (SLED 04/30/2017),B(SLED 05/30/2017).The issue i face here is as below

a) The SORT Rule at IM level do not work to select as per FEFO.

b) The SORT Rule at WM level do no work to select Batch as per FEFO.

c) Restricted Batches are also determined.

Thanks and Regards

Chitradeep