How To System Calculate Total Planned Cost For A Process Order In Cost Analysis.

We maintain activity type using KP26, we have total 6 activity.Ideally planned activity cost should calculate on the activity rate which we have maintain in KP26. but when i run cost analysis system calculates planned cost with other activity rate.

Ex. I have maintain a activity rate Factory Admin 3013 per hour, but system calculates total planned cost with activity rate 2614.