Skip to Content
avatar image
Former Member

Confusion about Proxy settings in SRM and ECC

Hello,

My interface is SAP SRM--PO7.5(java stack)--SAP ECC,

1.am doing PROXY to PROXY Scenario,whether the proxy settings are done in both sides (or) in single side??

2. SAP SRM there is a lot of predefined content is available,am importing those content from SRM to PO in ESR by importing objects and Receiver side is ECC system,In ECC system,how can i develop ESR part?? whether manually created data types,message types and service interfaces or else any other option is there,which is correct way.

could you please help me.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Mar 06, 2017 at 06:41 AM

    HI Anil,

    1--Yes you have to do that on both sides. SRM and PI single stack--1.am doing PROXY to PROXY Scenario,whether the proxy settings are done in both sides (or) in single side??

    2---If you are using standard content and your requirement is getting fulfilled then it is okay no need to touch ESR part it not in that case you have to modify the mapping -- SAP SRM there is a lot of predefined content is available,am importing those content from SRM to PO in ESR by importing objects and Receiver side is ECC system,In ECC system,how can i develop ESR part?? whether manually created data types,message types and service interfaces or else any other option is there,which is correct way.

    could you please help me.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Mar 17, 2017 at 11:40 AM

    Hello Ritu,

    Thank you for reply, proxy settings has been done in both SRM and ECC, In PI create two destinations in NWA.one for sender and another for receiver.

    In ESR part, downloaded the IR content in sevice market place,so no need to create datatypes,message types and service interfaces.

    In ID part, i create communication channel for sender and receiver and ICO.i think configuration part is completed.

    SRM persons hitting the messages.but, it is not coming to PI.

    where i do mistake,please help me

    Regards,

    Anil.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Mar 20, 2017 at 03:38 AM

    In SAP SRM system,RFC Destination SAPSLDAPI is it mandatory??

    am using PI 7.5 single stack

    could you please clarify me.

    Add comment
    10|10000 characters needed characters exceeded