Hi,

Do you know possibility for usage of MTO strategy with customer stock and MTS strategy on one part number at the same time?

We would like to have MTO strategy for sales orders (customer orders) and in that case generated customer stock and plan order for specifick customer order, but also at the same time to have plans (dependend requirements) for our own production and to have MTO without customer stock or MTS strategy on dependend requirements or order reservations from above BOM level.

Thank you

Ana

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Mar 03, 2017 at 09:25 AM

    Hi
    Could you please take a look of the below attached Link, Hope, this will server the purpose, for the issue/question posted above

    https://answers.sap.com/questions/140902/difference-bw-planning-strategy-50-nd-52-and-cane.html

    For any other details/assistance required, kindly let me know with your feedback/comments

    Many Thanks for your quick feedback : Best Regards : Raja Sekhara Reddy B

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      Thanks a lot for answer. Problem is that I would like to use both strategies on one/ same part number. If we use strategy MTO with customer stock, for every dependent requirement from above BOM level there will be generated separate Plan order, same as for customer order/ sales order.

      Is there possibility to separate sales orders from dependen requirements and order reservations?

      I am talkig about some component for example that is produced for higher BOM level within same factory and also produced for sales.

      Thanks

      Ana

  • Mar 03, 2017 at 09:46 AM

    Hi

    If you are already using some Strategy, kindly share the results/issue with the current Strategy, that you are using

    Else, please try with the above options, as suggested in the above Link attached

    Thanks & Regards : Raja Sekhara Reddy B

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Yes, we are using strategy 52,

      both order reservations and customer orders usses same stock.

      What we need is that in case sales order comes in strategy 50 is activated for specific SO.

      If order reservation from above BOM level is made, than strategy 52 stays.

      Maybe there is no SAP soulution for this at all, far as I know. Maybe someone had same need so there is some other way of handling of these kind of needs.

      Thanks

      Ana

      dphf5.png (61.2 kB)
  • Mar 03, 2017 at 10:57 AM

    Hi Ana
    Regarding your point mentioned in the Comment :

    ==================================================================='

    Is there possibility to separate sales orders from dependen requirements and order reservations?

    I am talkig about some component for example that is produced for higher BOM level within same factory and also produced for sales.

    ===================================================================='
    Could you please try, by setting up the , individual and coll. reqmts = 2, (MRP 4 view of the Material Master) for the Dependent components (which will not be linked to the sales Order stock, which is ref. by the Header Material of the BOM) ( as attached below)


    This is only my view/opinion, not sure, that will fulfill your Business requirement completely.
    Many Thanks for your kind feedback/comments : Best Regards : Raja

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      I tried, and it is not working.

      Verry possible that it is not so simple soulution for this.

      Thing is that it is needed since if it is for customer order than it suppose to be packed on one way and if it is for our own production, it should not be packet at all, just trasfered from production line to production line.

      The only way to sistematically separate these two according to my opinion is this way, but maybe you are awere of some other solution?

      Thanks

      Ana