cancel
Showing results for 
Search instead for 
Did you mean: 

Material Cost Estimate with Quantity Structure (S_P99_41000111) - what is the table for the log?

Former Member
0 Kudos

Hello experts
I am trying to find a way to extract the Material Cost Estimate with Quantity Structure log for the tables (using SE16n)
When i press F1 and press the technical information button, i find that the messagetext is in table CMF_FIXOUTPUT - but this is not a table i can access via SE16n as its "its not the correct category"


Has anyone been able to extract the log? - if so how?

Accepted Solutions (0)

Answers (0)