Production Module

Hi guys, my question is about the production module.

When im going to do a production order is possible to insert different events for different moments of production? For example i have to produce an item and i need 5 differents moments ( like paint, assemble ecc) , i know that i can receive one single material in different moments but, can i connect with a single material different events?

thank u.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Mar 02, 2017 at 01:34 PM

    Hi Valerio

    what I understad that you have different operation like paint , assembly. etc and you require new material code after all operations.

    You can do this with the help of maintaining "control key" in routing . When you Exclude the check " GR Required"

    T CODE OP00. it means no material code will generate.

    Thanks

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 02, 2017 at 08:02 PM

    Yes, You can do it by creating 5 operations within the routing and assign Control Key- PP03 for those operations. PP03 is a mile stone confirmation and has a auto goods receipt.

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 03, 2017 at 05:45 AM

    Hi

    As per my understanding to your question giving the answer

    *You can assign any number of materials to a Single operation in the Material Assignment segment in Routing ( You can receive more than single material in different moments)

    *And also you can assign same material to all the operations providing giving inputs of different quantities for different operations

    Both the things are done in Routing

    Thanks and Regards

    Yuvraj Sanga

    Add comment