Skip to Content
author's profile photo Former Member
Former Member

Doubt in Material Master creation

Hai,

In material creation transaction(MM01) some of the fields are required fields. I want to change it.

I tried in the Transaction OMSR(Assign fields to fields selection group(for Ex Field selection group 2)).

In the Tx OMS9 in the field reference i made it as Optional entry.

But still it shows requeird fields, example material group that is in (Field selection group 2).

Please any one tell me suggestion.

Thanks,

Tamil

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2006 at 03:05 PM

    Hi,

    Try in spro.

    Regards

    Amole

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 16, 2006 at 03:11 PM

    Hi Tamil,

    In mm01 , once you get that error message, double click on that message.

    It will have a documentation on how to make that a warning message instead of an error.

    REgards,

    ravi

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.