We have CWM managed material with base unit KG, same as valuation unit of measure. Parallel unit is Bags.

In Purchase order we have a condition on per bag basis. But at the time of GR, system does not consider actual number of bags entered for the transaction to calculate the condition value. Instead it is taking standard conversion from material master defeating the objective of CWM option of overriding standard conversion with actual number at GR.

Has anyone faced same situation and any guidance how this was overcome?

Sriram