Hi
I am creating a new PC with IP load and DTP load (master data) -- as always -- (previous step -- not only on failure or success etc.) Now if I want to have the step repeated on 1 Hr (3600 sec and 3 times repetition).
I right click on IP load and Automatic repetition with 3600 and 3 times.
My question is does it trigger only on failure or every 3600 seconds for 3 times. (I do not have any setting to say trigger only on failure). I am assuming it triggers only on failure.
Please confirm